We received this tonight – hopefully it will mean that the good folks in upper Northgate are able to get in and out;
TTROs are not usually advertised on the roads that they are going to effect. I would expect a black and yellow “roadworks here on #date” sign to be erected prior to the works.
The patching works being advertised would be unlikely to cause any significant delay, so I would not expect our engineers to arrange a letter drop. If it were full surfacing works, or works likely to cause a delay, we would provide the effected residents with an advance warning letter. Access for the residents will be maintained at all times, but will be under the direction of the Traffic Management staff.
Our TTROs are all advertised online at www.roadworks.org and also circulated to our standard distribution list.
The furore about the Northgate Planning Application saw this drop off the radar, my apologies.
Upper Northgate will be closed on or around 4th July – see the attachment.
The closure will come into force on 4th July 2017 and will be in force for a maximum of five days. It is anticipated that the work will last for approximately two days.
here is the body of the message:
Cheshire West and Chester Borough Council
Road Traffic Regulation Act 1984
Temporary Road Closure
Northgate in Utkinton
Notice is hereby given pursuant to the provisions of Section 14 of the Road Traffic Regulation Act 1984 the effect of which will be to prohibit traffic on the following lengths of roads in Utkinton to enable patching works to be carried out by Cheshire West and Chester Council.
Northgate, Utkinton
Nothing in the Order shall prevent driving upon the said lengths of road of any vehicle which is being used for the conveyance of persons goods or merchandise to or from any premises situate on or adjacent to the lengths of road or in connection with agriculture building construction works of repair and the like or use in an emergency of vehicles for fire brigade ambulance or police purposes. A through route will not always be available and any vehicles not requiring access to properties on the length of road should use alternative routes.
The closure will come into force on 4th July 2017 and will be in force for a maximum of five days. It is anticipated that the work will last for approximately two days.
Kieran Collins (Ref TRO1669)
Place Operations
Highways Office
Guilden Sutton Lane
Guilden Sutton
Chester
Cheshire CH3 7EX
Tel: 0300 123 7036
Email: engch@cheshirewestandchester.gov.uk
22nd June 2017
You must be logged in to post a comment.