Utkinton Road Junction Closed

This from CWaC

Temporary road closure

Notice is hereby given pursuant to the provisions of Section 14 of the Road Traffic Regulation Act 1984 the effect of which will be to prohibit traffic on the following lengths of roads in Tarporley to enable 120m of mains cable to reinforce network, works to be carried out by SP Energy Networks.

  • High Street/Rode Street – Tarporley (From No 30 High Street to No 2 Rode Street)

Nothing in the Order shall prevent driving upon the said lengths of road of any vehicle which is being used for the conveyance of persons goods or merchandise to or from any premises situate on or adjacent to the lengths of road or in connection with agriculture building construction works of repair and the like or use in an emergency of vehicles for fire brigade ambulance or police purposes. A through route will not always be available and any vehicles not requiring access to properties on the length of road should use alternative routes.

The closure will come into force on 11 February 2019 and will be in force for a maximum of twenty one days. It is anticipated that the work will last for approximately 14 days.

Kieran Collins (Ref TRO 2269)
Place Operations
Highways Office
Phoenix House
Clough Road
Winsford
Cheshire CW7 4BD
Tel: 0300 123 7036
Email: engvr@cheshirewestandchester.gov.uk

Screenshot 2019-02-11 at 15.23.34

This entry was posted in News. Bookmark the permalink.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.